Once the zoning is approved, the plans are reviewed by the appropriate sub-code officials (building, fire, electric, plumbing), whichever apply to your project, for completeness and code compliance.Ĥ. The Zoning Officer will complete the zoning review. Submit the required documents to the Construction Department.Ģ. The location of any easements on the property.ġ.Distances to the lot lines, septic system and well.The location of the proposed structure you are requesting approval for.All existing structures on the property.These drawings may be done by the applicant for his own single family dwelling or by a New Jersey licensed architect.įor any additions to the property, the applicant must also submit a zoning application along with a property survey. The documentation required for a construction permit includes:Ī permit application is available from the construction department or you can locate on the forms tab at the top of the page.Īlong with the completed application, the applicant must submit three copies of the construction plans. Repair or replace any structural member, such as increasing the size of a window or door.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |